The following Turnpike construction projects are listed in reverse chronological order (newest first). As they become available, we will post the project title and description, plans, contractor bid book, advertisement, schedule of items, plan holder list, bid tabulations, and award information.
Bid Opening | Time | Contract | Title/Details | Municipality | Awarded To |
---|---|---|---|---|---|
Bid Date: 02/13/25 | Time: 10:30 AM | Contract: 2025.01 | Pavement Rehabilitation, Guardrail & Drainage Improvements, Bridge Joint Repairs MM 13.4 to MM 20.0 | Municipality: Wells | Awarded To: |
Bid Date: 02/13/25 | Time: 10:00 AM | Contract: 2025.06 | Bridge Repair - Androscoggin River Overpass Mile 78.9 | Municipality: Auburn/Lewiston | Awarded To: |
Bid Date: 01/21/25 | Time: 11:00 AM | Contract: 2025.03 | Pavement Rehabilitation, Safety Improvements & Pipe End Repairs MM 51.2 to 54.5 | Municipality: | Awarded To: Coastal Road Repair, LLC |
Bid Date: 01/16/25 | Time: 11:00 AM | Contract: 2025.04 | Bridge Repairs - Various Locations | Municipality: York, Saco, Falmouth | Awarded To: CPM Constructors, Inc. |
Bid Date: 12/12/24 | Time: 11:00 AM | Contract: 2025.02 | Portland Area Pavement Rehabilitation Northbound Mile 42.0 to 49.3 | Municipality: Portland Area | Awarded To: Coastal Road Repair, LLC |
Bid Date: 11/19/24 | Time: 10:00 AM | Contract: 2024.17 | Bridge Repairs - Stevenstown Road Underpass Mile 96.5 | Municipality: Litchfield | Awarded To: |
Bid Date: 10/15/24 | Time: 11:00 AM | Contract: 2025.09 | Roadside Clearing | Municipality: Arundel & Wells | Awarded To: Comprehensive Land Technologies, Inc. |
Bid Date: 10/08/24 | Time: 11:00 AM | Contract: 2025.05 | Widened Concrete Haunch Removals - Various Locations | Municipality: | Awarded To: CPM Constructors, Inc. |
Bid Date: 07/18/24 | Time: 11:00 AM | Contract: 2024.16 | Slope and Drainage Repairs MM 11.4 to 51.9 | Municipality: | Awarded To: R.J. Grondin |
Bid Date: 06/13/24 | Time: 1:00 PM | Contract: 2024.12 | Cleaning and Painting Steel Structures - Various Locations | Municipality: Gray/New Gloucester | Awarded To: Saffo Contractors, Inc. |
Bid Date: 05/21/24 | Time: 11:00 AM | Contract: 2024.11 | Cumberland Service Plaza Fuel System Replacement Southbound MM 58.8 | Municipality: Cumberland | Awarded To: SRS Petroleum Services |
Bid Date: 05/21/24 | Time: 11:00 AM | Contract: 2024.06 | Bridge Repairs - Various Locations South | Municipality: York/Kennebunk | Awarded To: CPM Constructors, Inc. |
Bid Date: 05/21/24 | Time: 11:00 AM | Contract: 2024.13 | Culvert & Slope Repairs MM 72.2 | Municipality: New Gloucester | Awarded To: Chase Excavating, Inc. |
Bid Date: 05/21/24 | Time: 11:00 AM | Contract: 2024.08 | Exit 36 Pavement Repairs & Biddeford/Kennebunk Park and Ride | Municipality: Kennebunk/Biddeford/Saco | Awarded To: Coastal Road Repair, LLC |
Bid Date: 05/16/24 | Time: 11:00 AM | Contract: 2024.15 | Variable Message Sign & Walkway Replacement MM 30.35NB & MM 47.7SB | Municipality: | Awarded To: Moulison Electric, Inc. |
Bid Date: 04/23/24 | Time: 1:00 PM | Contract: 2024.09 | York Vehicle Storage Garage | Municipality: York | Awarded To: Optimum Construction, Inc. |
Bid Date: 04/23/24 | Time: 11:00 AM | Contract: 2024.07 | Bridge Repairs - Various Locations North | Municipality: Falmouth/Auburn | Awarded To: CPM Constructors, Inc. |
Bid Date: 03/21/24 | Time: 11:00 AM | Contract: 2024.04 | Pavement Rehabilitation - Exit 75 Auburn | Municipality: Auburn | Awarded To: R.J. Grondin |
Bid Date: 03/14/24 | Time: 1:00 PM | Contract: 2024.05 | Cleaning and Painting Steel Structures - Various Locations | Municipality: Gray, New Gloucester & West Gardiner | Awarded To: No Award |
Bid Date: 02/22/24 | Time: 11:00 AM | Contract: 2024.02 | Portland Area Pavement Rehabilitation Southbound Mile 42.0 to 49.3 | Municipality: Portland Area | Awarded To: Coastal Road Repair, LLC |
Bid Date: 12/19/23 | Time: 11:00 AM | Contract: 2024.10 | Roadside Clearing Mile 25.8 to Mile 32.0 | Municipality: Kennebunk/Biddeford | Awarded To: Comprehensive Land Technologies, Inc. |
Bid Date: 12/12/23 | Time: 11:00 AM | Contract: 2024.01 | Pavement Rehabilitation - Exits 1, 2, 3 & MM 1.3 to MM 6.8 | Municipality: Kittery/York | Awarded To: Pike Industries, Inc. |
Bid Date: 11/16/23 | Time: 1:00 PM | Contract: 2023.11 | York Maintenance Electrical Repairs Mile 6.8 | Municipality: York | Awarded To: Moulison Electric, Inc. |
Bid Date: 11/16/23 | Time: 11:00 AM | Contract: 2024.03 | Pavement Rehabilitation, Clearzone and Drainage Improvements MM 20.0 TO MM 23.3 | Municipality: Wells | Awarded To: Pike Industries, Inc. |
Bid Date: 10/12/23 | Time: 11:00 AM | Contract: Litchfield Maintenance Restroom Renovations Mile 92.7 | Litchfield | Municipality: | Awarded To: E.J. Perry Construction Company |
Bid Date: 07/18/23 | Time: 11:00 AM | Contract: 2023.04 | Emergency Vehicle Ramps - High Street MM 103.6 | Municipality: West Gardiner | Awarded To: Sargent Corporation |
Bid Date: 07/18/23 | Time: 11:00 AM | Contract: 2023.08 | Bridge Repairs - Scarborough Interchange Underpass Mile 42.5 | Municipality: Scarborough | Awarded To: CPM Constructors, Inc. |
Bid Date: 06/15/23 | Time: 1:00 PM | Contract: 2023.06 | YORK VEHICLE STORAGE GARAGE | Municipality: York | Awarded To: No Award |
Bid Date: 03/16/23 | Time: 11:00 AM | Contract: 2023.03 | Bridge Repairs - Eagles Nest Road Southbound Overpass Mile 60.81 & Superstructure Replacement Route 122 Underpass Mile 74.00 | Municipality: Auburn | Awarded To: CPM Constructors, Inc. |
Bid Date: 02/09/23 | Time: 11:00 AM | Contract: 2023.01 | Pavement Rehabilitation & Drainage Improvements MM 88.6 TO MM 98.0 | Municipality: | Awarded To: Pike Industries, Inc. |
Bid Date: 12/13/22 | Time: 11:00 AM | Contract: 2023.02 | Exit 102 New On Ramp | Municipality: West Gardiner | Awarded To: R. J. Grondin & Sons |
Bid Date: 12/06/22 | Time: 11:00 AM | Contract: 2022.07 | Interchange Improvements - Saco | Municipality: Saco | Awarded To: Sargent Corporation |
Bid Date: 06/16/22 | Time: 1:00 PM | Contract: 2022.13 | Southern Bridge Repairs #2 | Municipality: Kittery | Awarded To: New England Infrastructure, Inc. |
Bid Date: 05/19/22 | Time: 2:00 PM | Contract: 2022.12 | Southern Bridge Repairs | Municipality: Kittery & Wells | Awarded To: CPM Constructors, Inc. |
Bid Date: 05/17/22 | Time: 11:00 AM | Contract: 2022.14 | West Gardiner Waterline Replacement | Municipality: West Gardiner | Awarded To: St. Laurent & Sons, Inc. |
Bid Date: 04/21/22 | Time: 1:00 PM | Contract: 2022.11 | EVR & Pavement Improvements - Littlefield Road - MM 17.30 | Municipality: Wells | Awarded To: R.J. Grondin & Sons |
Bid Date: 03/29/22 | Time: 11:00 AM | Contract: 2022.08 | Litchfield 8-Bay Garage Replacement | Municipality: Litchfield | Awarded To: The Sheridan Corporation |
Bid Date: 03/24/22 | Time: 11:00 AM | Contract: 2022.02 | Exit 36 Improvements & Pavement Rehabilitation MM 35.5 to 36.2 | Municipality: Saco, Biddeford, Kennebunk & Scarborough | Awarded To: Pike Industries, Inc. |
Bid Date: 02/24/22 | Time: 2:00 PM | Contract: 2022.06 | Superstructure Replacement - Richmond Road (Route 197) Underpass Mile 93.3 | Municipality: Litchfield | Awarded To: Scott Construction Corporation |
Bid Date: 02/24/22 | Time: 1:00 PM | Contract: 2022.01 | Pavement Rehabilitation and Drainage Improvements MM 102.6 TO MM 109.1 | Municipality: Gardiner | Awarded To: Eurovia Atlantic Coast LLC. dba Northeast Paving |
Bid Date: 02/22/22 | Time: 1:00 PM | Contract: 2022.04 | Bridge Repairs - Various Locations & EVR Littlefield Road | Municipality: Kittery & Wells | Awarded To: No Award |
Bid Date: 01/18/22 | Time: 10:00 AM | Contract: 2021.06 | New Vehicle Storage Garage - Crosby Maintenance | Municipality: South Portland | Awarded To: Doten's Construction, Inc. |
Bid Date: 10/14/21 | Time: 11:00 AM | Contract: 2021.08 | Portland Area Widening & Safety Improvements MM 46.4 TO MM 49.3 | Municipality: South Portland & Portland | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 07/20/21 | Time: 1:00 PM | Contract: 2021.05 | York Toll Plaza Demolition and Mainline Reconstruction, Mile 7.3 | Municipality: York | Awarded To: Sargent Corporation |
Bid Date: 07/08/21 | Time: 11:00 AM | Contract: 2021.02 | Water Line and Utility Vaults MM 47.1, MM 47.6, & MM 48.5 | Municipality: Portland | Awarded To: Wyman & Simpson, Inc. |
Bid Date: 05/20/21 | Time: 11:00 AM | Contract: 2021.03 | Bridge Repairs - Various Locations | Municipality: Multiple | Awarded To: CPM Constructors, Inc. |
Bid Date: 03/23/21 | Time: 11:00 AM | Contract: 2021.01 | Pavement Rehabilitation & Safety Improvements MM 30.0 TO MM 35.5 & Exit 32 Southbound Deceleration Lane Construction | Municipality: Biddeford/Saco | Awarded To: Pike Industries, Inc. |
Bid Date: 02/18/21 | Time: 11:00 AM | Contract: 2021.07 | Exit 45 Interchange Reconfiguration, Mile 44.9 | Municipality: South Portland | Awarded To: CPM Constructors, Inc. |
Bid Date: 06/18/20 | Time: 11:00 AM | Contract: 2020.09 | Emergency Vehicle Ramps - Forest Avenue Overpass MM 50.0 | Municipality: Portland | Awarded To: RJ Grondin & Sons |
Bid Date: 04/21/20 | Time: 11:00 AM | Contract: 2020.06 | Emergency Vehicle Ramps - Various Locations MM 6.2, 10.6 & 19.9 | Municipality: Multiple | Awarded To: R.J. Grondin & Sons |
Bid Date: 03/19/20 | Time: 11:00 AM | Contract: 2020.03 | Portland Area Widening & Safety Improvements MM 43.0 to 46.4 | Municipality: Scarborough, South Portland & Portland | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 02/20/20 | Time: 10:00 AM | Contract: 2020.05 | New Gloucester/West Gardiner Barrier Toll Plaza Ort Equipment Updates | Municipality: New Gloucester/West Gardiner | Awarded To: Scott Construction Corporation |
Bid Date: 01/21/20 | Time: 11:00 AM | Contract: 2020.01 | Pavement Rehabilitation, Guardrail & Clear Zone Improvements MM 35.3 TO MM 42.0 | Municipality: Saco & Scarborough | Awarded To: Pike Industries, Inc. |
Bid Date: 12/17/19 | Time: 11:00 AM | Contract: 2019.16 | Exit 44 Building Renovation, Mile 44.3 | Municipality: Scarborough | Awarded To: Blane Casey Building Contractor, Inc. |
Bid Date: 12/12/19 | Time: 11:00 AM | Contract: 2020.07 | Bridge Repairs - Various Locations | Municipality: | Awarded To: CPM Constructors, Inc. |
Bid Date: 11/19/19 | Time: 1:00 PM | Contract: 2019.12 | New Mechanics Garage - Litchfield Maintenance Garage MM 92.7 | Municipality: Litchfield | Awarded To: The Sheridan Corporation |
Bid Date: 11/19/19 | Time: 11:00 AM | Contract: 2019.02 | Kennebunk Travel Plazas Parking Expansion Mile 25.5 SB & NB and Route 35 Traffic Signals | Municipality: Kennebunk | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 08/27/19 | Time: 11:00 AM | Contract: 2019.13 | Exit 45 Embankment Preload Mile 44.9 | Municipality: Scarborough & South Portland | Awarded To: Sargent Corporation |
Bid Date: 07/18/19 | Time: 11:00 AM | Contract: 2019.15 | Gray Service Plaza - Fuel System Replacement Mile 58.8 NB | Municipality: Gray | Awarded To: SRS Petroleum Services |
Bid Date: 05/14/19 | Time: 11:00 AM | Contract: 2019.01 | Pavement Rehabilitation MM 42.0 to MM 44.3 | Municipality: Scarborough | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 04/23/19 | Time: 11:00 AM | Contract: 2019.07 | Route 109/EXIT 19 Improvements - VOLUME II | Municipality: Wells | Awarded To: No Award |
Bid Date: 04/23/19 | Time: 11:00 AM | Contract: 2019.10 | Bridge Replacement - Warren Avenue Overpass (MILE 49.0) | Municipality: Portland | Awarded To: Reed & Reed, Inc. |
Bid Date: 04/18/19 | Time: 11:00 AM | Contract: 2019.04 | Interchange 103 Barrier Toll Plaza ORT Conversion Mile 103.0 | Municipality: West Gardiner | Awarded To: Sargent Corporation |
Bid Date: 03/21/19 | Time: 11:00 AM | Contract: 2019.03 | Guide Sign Modifications, Phase IV (Mile 0.0 to 32.52) | Municipality: Various | Awarded To: CPM Constructors, Inc. |
Bid Date: 03/21/19 | Time: 11:00 AM | Contract: 2019.11 | Northern Bridge Repairs - Various Locations (MM 62.3 to 95.6) | Municipality: Various | Awarded To: Scott Construction Corporation |
Bid Date: 02/14/19 | Time: 11:00 AM | Contract: 2019.06 | Southern Bridge & Culvert Repairs - Various Locations (MM 10.6 to 32.20) | Municipality: Various | Awarded To: CPM Constructors, Inc. |
Bid Date: 01/10/19 | Time: 11:00 AM | Contract: 2018.23 | Maintenance Garage Extensions & HVAC System Improvements - Various Locations | Municipality: Various | Awarded To: Blane Casey Building Contractor, Inc. |
Bid Date: 11/09/18 | Time: 1:00 PM | Contract: 2019.09 | Bridge Improvements - Stroudwater River Overpass Mile 46.7 Bridge Improvements - Maine Central Railroad Overpass Mile 47.9 | Municipality: Portland | Awarded To: Cianbro Corporation |
Bid Date: 10/30/18 | Time: 11:00 AM | Contract: 2018.19 | Bridge Replacement - Cummings Road Underpass Mile 44.6 | Municipality: Scarborough | Awarded To: CPM Constructors, Inc. |
Bid Date: 10/11/18 | Time: 11:00 AM | Contract: 2018.20 | York Toll Plaza, Mile 8.8 | Municipality: York | Awarded To: Reed & Reed, Inc. |
Bid Date: 08/30/18 | Time: 11:00 AM | Contract: 2018.02 | Exit 47 Intersection Improvements Pavement Rehabilitation and Clear Zone Improvements Mile 47 | Municipality: Portland | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 08/21/18 | Time: 11:00 AM | Contract: 2018.15 | Bridge Rehabilitation - Cobbosseecontee Stream Overpass Mile 99.2 & Bridge Repairs - Androscoggin River Overpass Mile 78.9 | Municipality: Litchfield/West Gardiner & Lewiston/Auburn | Awarded To: Wyman & Simpson, Inc. |
Bid Date: 07/31/18 | Time: 11:00 AM | Contract: 2018.18 | Kennebunk Travel Plazas Fuel System Replacement Mile 25.5 NB & SB | Municipality: Kennebunk | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 07/24/18 | Time: 10:00 AM | Contract: 2018.21 | Interstate 195 Culvert Linings | Municipality: Saco | Awarded To: Ted Berry Company, Inc. |
Bid Date: 06/26/18 | Time: 11:00 AM | Contract: 2018.17 | AUBURN EXIT 75: Toll System Upgrades & Stream Relocation (MM 75.3) KENNEBUNK EXIT 25: Toll System Upgrades (MM 25.5) WELLS EXIT 19: Directional Bore (MM 19.0) | Municipality: Auburn/Kennebunk/Wells | Awarded To: Scott Construction Corporation |
Bid Date: 06/21/18 | Time: 10:00 AM | Contract: 2018.16 | Emergency Vehicle Ramps Blackstrap Road Underpass Mile 52.0 | Municipality: Falmouth | Awarded To: Shaw Brothers Construction, Inc. |
Bid Date: 04/24/18 | Time: 11:00 AM | Contract: 2018.12 | Pavement Rehabilitation, Guardrail, Drainage, & Clear Zone Improvements MM 74.9 TO MM 80.7 | Municipality: Auburn/Lewiston | Awarded To: The Lane Construction Corporation |
Bid Date: 04/24/18 | Time: 10:00 AM | Contract: 2018.14 | Maintenance Garage Extensions - Kennebunk & Gray Maintenance Facilities New Heating System - Crosby Maintenance Facility | Municipality: Kennebunk/South Portland/Gray | Awarded To: No Award |
Bid Date: 03/20/18 | Time: 11:00 AM | Contract: 2018.01 | Pavement Rehabilitation & Clear Zone Improvements MM 98.0 TO MM 102.17 | Municipality: Litchfield/West Gardiner | Awarded To: Pike Industries, Inc. |
Bid Date: 03/20/18 | Time: 10:00 AM | Contract: 2018.07 | Androscoggin River Bridges Substructure Repairs Mile 78.9 | Municipality: Auburn/Lewiston | Awarded To: No Award |
Bid Date: 03/15/18 | Time: 11:30 AM | Contract: 2018.06 | Parking Installation - Kennebunk Southbound Service Plaza MM 25.5 Paving Rehabilitation - Biddeford Interchange Mile 31.6 Bridge And Culvert Repairs - Crediford Brook Culvert MM 18.75, Route 111 Underpass MM 31.3, Biddeford Interchange Underpass MM 31.6 | Municipality: Wells/Kennebunk/Biddeford | Awarded To: Scott Construction Corporation |
Bid Date: 03/15/18 | Time: 11:00 AM | Contract: 2018.05 | Exit 103 I-295 Southbound Underpass Bridge Rehabilitation Mile 103.0 | Municipality: Gardiner | Awarded To: Wyman & Simpson, Inc. |
Bid Date: 02/20/18 | Time: 11:00 AM | Contract: 2018.08 | Bridge Repairs - Dennett Road Overpass - Mile 0.6 Snow Fence Installation - Wilson Road Underpass - Mile 2.0 Wearing Surface Repairs - York River Bridge - Mile 5.2 | Municipality: Kittery/York | Awarded To: CPM Constructors |
Bid Date: 02/15/18 | Time: 1:00 PM | Contract: 2018.04 | Cleaning & Painting Steel Structures | Municipality: York/Ogunquit/West Gardiner | Awarded To: Southern Road & Bridge, LLC |
Bid Date: 02/15/18 | Time: 11:00 AM | Contract: 2018.03 | Exit 44 Southbound On Ramp Improvements - Mile 44.3 | Municipality: Scarborough | Awarded To: R J Grondin & Sons |
Bid Date: 02/13/18 | Time: 11:00 AM | Contract: 2018.13 | Guide Sign Modifications, Phase III | Municipality: Various | Awarded To: Liddell Brothers, Inc. |
Bid Date: 01/18/18 | Time: 11:00 AM | Contract: 2018.10 | Bridge And Culvert Repairs - 4 Locations (Mile 75.8 To Mile 91.9) | Municipality: Various | Awarded To: Scott Construction Corporation |
Bid Date: 11/13/14 | Time: 11:00 AM | Contract: 2014.10 | Interchange Improvements Lewiston (Exit 80) Phase 2 (Bridge and Mainline) Mile 80.3 | Municipality: Lewiston | Awarded To: CPM Constructors |